Close Menu
Elon Musk Monitor
  • Home
  • Elon Musk
  • AI
  • Cybertruck
    • DOGE & Cryptocurrency
    • Financial & Business
  • Grok
    • Hyperloop & Urban Mobility
    • Innovations & Future Projects
  • Mars Colonization
  • Neuralink
    • Philanthropy & Humanitarian Efforts
    • Public Perception & Cultural Impact
    • SolarCity & Renewable Energy
  • SpaceX
  • Starlink
  • Tesla
    • The Boring Company
  • X

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

Ethereum Breaks Key Resistance In One Massive Move – Higher High Confirms Momentum

May 10, 2025

XRP Analyst Marks XDC For 3,350% Take-Off As Bullish Metrics Emerge

May 10, 2025

Sovereigns Are Buying Billions Of Bitcoin: Anthony Scaramucci

May 10, 2025
Facebook X (Twitter) Instagram
Elon Musk Monitor
  • Home
  • About Us
  • Advertise with Us
  • Contact Us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
  • Home
  • Elon Musk
  • AI
  • Cybertruck
    • DOGE & Cryptocurrency
    • Financial & Business
  • Grok
    • Hyperloop & Urban Mobility
    • Innovations & Future Projects
  • Mars Colonization
  • Neuralink
    • Philanthropy & Humanitarian Efforts
    • Public Perception & Cultural Impact
    • SolarCity & Renewable Energy
  • SpaceX
  • Starlink
  • Tesla
    • The Boring Company
  • X
Elon Musk Monitor
Home » Engine change delays ispace-built lunar lander mission
SpaceX

Engine change delays ispace-built lunar lander mission

elonmuskBy elonmuskMay 9, 2025No Comments3 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link


WASHINGTON — A change in engines will cause the launch of a lunar lander being built for a NASA-funded mission to slip from 2026 to 2027.

In a May 9 statement, ispace U.S., the American subsidiary of Japan’s ispace, said it will use a new engine called VoidRunner for its Apex 1.0 lunar lander. That lander is being developed by ispace U.S. for a team led by Draper flying a mission that is part of NASA’s Commercial Lunar Payload Services (CLPS) program.

The company previously planned to use an engine from Agile Space Industries called A2200, a bipropellant engine that produces about 2,200 newtons (500 pounds-force) of thrust. However, ispace U.S. said that after a review with Agile, the companies concluded the A2200 “would not be supplied within the originally planned procurement schedule.”

VoidRunner is an engine jointly developed by ispace U.S. and Agile, using a valve system created internally by ispace U.S. The companies did not disclose technical details about the engine beyond that it requires one-fourth the parts “and enabled simplifications to the vehicle-level architecture.” The engine has been test-fired by Agile in a vacuum test stand, the companies noted.

However, switching engines will require changes to the lander design. As a result, ispace U.S. said the launch of what it calls Mission 3 would slip from 2026 to 2027.

“Agile is committed to ensuring our technology fully empowers ispace’s Mission 3 to success. We were confident that VoidRunner meets ispace U.S.’s performance expectations but also drives long-term efficiency,” Chris Pearson, chief executive of Agile Space Industries, said in a statement.

“We are confident in the new propulsion system and renewed collaboration with Agile,” added Elizabeth Kryst, chief executive of ispace U.S., in the same statement.

The Mission 3 lander will be used for a CLPS mission called CP-12 by NASA, with Draper as the lead. The spacecraft will land in Schrödinger Basin on the far side of the moon carrying seismometers, an instrument to measure heat flow in the moon’s interior and sensors to measure electrical and magnetic fields at the lunar surface. NASA awarded Draper the $73 million task order for the CP-12 mission in 2022, then planned for launch in 2025.

Besides the lander, the mission will include two satellites, called Alpine and Lupine, that will serve as communications relays for the lander, which will be out of sight from the Earth on the lunar farside. The satellites, built by Blue Canyon Technologies, will be available for other uses after the end of the CP-12 mission.

In a NASA presentation at the Lunar Surface Science Workshop online May 7, the CP-12 mission was still listed as having a launch in the fourth quarter of 2026. It was touted as one of three CLPS missions projected to launch in 2026, along with Intuitive Machines’ IM-3 mission and Firefly Aerospace’s Blue Ghost 2. With the delay in CP-12, Blue Ghost 2 is now in line to be the first CLPS mission to attempt a landing on the lunar farside.

While ispace U.S. is working with Draper for this CLPS mission, it is pursuing other opportunities to be involved in CLPS. The company announced April 8 a partnership with Redwire to collaborate on lunar lander missions, including the CLPS program. Redwire is a part of CLPS through its 2020 acquisition of Deep Space Systems, one of the nine original companies selected by NASA to participate in the program in 2018, but has yet to win a CLPS task order.

Related



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
elonmusk
  • Website

Related Posts

Space Force sharpens focus on deterring rivals

May 9, 2025

Space agencies grapple with potential changes to Artemis

May 9, 2025

China to launch new modules to Tiangong space station

May 9, 2025
Leave A Reply Cancel Reply

Don't Miss
Cybertruck

Tesla Cybertruck police truck donor revealed

A batch of Tesla Cybertrucks were recently revealed to be a donation to the Las…

Tesla upgrades its ridiculous Cybertruck wiper after owners report issue

February 27, 2025

Tesla Cybertruck contract with State Dept. may have been modified after Biden admin

February 26, 2025

This Tesla Cybertruck feature helped it earn a ‘Best Tech’ award

February 25, 2025
Top Posts

Ethereum Breaks Key Resistance In One Massive Move – Higher High Confirms Momentum

May 10, 2025

XRP Analyst Marks XDC For 3,350% Take-Off As Bullish Metrics Emerge

May 10, 2025

Sovereigns Are Buying Billions Of Bitcoin: Anthony Scaramucci

May 10, 2025

Steak ‘N Shake to Accept Bitcoin Payments in the US, Sending New Crypto to Explosive Highs

May 9, 2025

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

About Us
About Us

Welcome to Elon Musk Monitor, your go-to source for comprehensive, up-to-date information on the life, work, and innovations of one of the most influential figures in the world today—Elon Musk. Our mission is to keep you informed about Musk’s ventures and projects, ranging from electric vehicles to space exploration, and everything in between. Whether you’re a tech enthusiast, investor, or simply curious about Musk’s impact on the world, we’ve got you covered.

Facebook X (Twitter) Pinterest YouTube WhatsApp
Our Picks

Ethereum Breaks Key Resistance In One Massive Move – Higher High Confirms Momentum

May 10, 2025

XRP Analyst Marks XDC For 3,350% Take-Off As Bullish Metrics Emerge

May 10, 2025

Sovereigns Are Buying Billions Of Bitcoin: Anthony Scaramucci

May 10, 2025
Most Popular

How I met my partner on X/Twitter

February 8, 2025

DOGE staffer resigns after racist posts uncovered. Elon Musk might bring him back.

February 9, 2025

OpenAI accuses DeepSeek of stealing data, internet digs into the ‘irony’

February 9, 2025
  • Home
  • About Us
  • Advertise with Us
  • Contact Us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2025 elonmuskmonitor. Designed by elonmuskmonitor.

Type above and press Enter to search. Press Esc to cancel.